Glasgow Subway Modernisation

Summary of Works

  • New HV / LV Power Supplies throughout network
  • Design / Manufacture and Install route-wide Switchgear
  • Installation of lineside CBTC system
  • Installation of Fibre and Waveguide system
  • Installation of CCTV at various Bus Depots and Control Room
  • Installation of network wide SISS system
  • CLIENT Ansaldo STS (Hitachi)
  • YEAR 2017 - 2019
  • CATEGORY