OSL Publish Carbon Reduction Policy
OSL Global are pleased to publish our latest plan of compliance with Action Note PPN 06/21.
Gatwick Station Project (GSP)
Collaborating with Costain, OSL are improving Gatwick Airport station to create more space for passengers, making the journey from the train to the plane easier, improving accessibility and supporting a more reliable train service.
Clacton Resignalling Project
OSL were the multidisciplinary Signalling Contractor for the delivery of the Clacton Resignalling works, including E&P Signalling Power, E&P Power/Points heating and lineside telecoms.
#PositiveChanges Eastrington Bug Hotel
The ‘Eastrington Bug Hotel’ was built for the F2G project with the intention of joining areas of wildlife habitat, and enhancing an area of waste land, improving the local environment and creating a wildlife corridor where small mammals, rodents, birds and insects can move from area to area in relative safety.
Ofsted: This College Transforms Lives
We are excited to announce that Crewe Engineering & Design UTC have been rated Good in all areas in their first OFSTED.
Spotlight on Safety
Safety is the foundation of OSL’s business and we are committed to ensuring the safety of all stakeholders. We’re sharing some images of the Kilkerran site compound in Scotland today to show ‘What good looks like from a welfare set up perspective’.
Glasgow Subway Modernisation
OSL is a long term strategic partner of Ansaldo and has a framework to undertake a variet of work across power, signalling and telecommunications equipment for the upgrade of the Glasgow subway.
Kilkerran Signal Box Life Extension Works
The objective of the project was to carry out various Life Extension Works and Renewals in the Kilkerran signal box area including the full renewal of the existing level crossing and the provision of new LED Road Traffic Lights.
Southampton Freight Train Lengthening
For these works, OSL are conducting all designs through to GRIP 4 – 8. GRIP 4 has been successfully completed and GRIP 5 is currently being delivered to schedule. This includes all design works from Panel design, Trackside through to the design of the Smartlock data.